Airing Time
The time the adhesive must be left open before applying the floorcovering.
Vinyl Sheet/CV 10-20 minutes
LVT 10-20 minutes
Rubber up to 2.5 mm thickness 5-10 minutes
Linoleum 5-10 minutes
Textile 0-10 minutes
Working Time
The time in which the adhesive can receive floorcovering, after initial airing time*.
Vinyl Sheet/CV up to 40 minutes
LVT up to 30 minutes
Rubber up to 2.5 mm thickness up to 15 minutes
Linoleum up to 10 minutes
Textile up to 25 minutes
Open Time
The combination of airing and working time.
Vinyl Sheet/CV up to 50 minutes
LVT up to 40 minutes
Rubber up to 2.5 mm thickness up to 20 minutes
Linoleum up to 15 minutes
Textile up to 25 minutes
Times may vary depending on the absorbency of the subfloor and ambient conditions. Above times in accordance to 20°C & 65% RH.